Pac Technologies Get in touch
HomeBlog
01Technical guides

From the
engineering desk

Long-form guides and articles on industrial automation in Australia. Written by the team that delivers the projects, not by marketing. Useful for plant managers and engineering teams scoping their next move.

04All articles

The full index

Sixteen articles, written for engineers and plant managers rather than search engines.

04

Rockwell ControlLogix programming in Australia

PlantPAx versus raw ControlLogix, FactoryTalk View SE versus ME, RSLogix to Studio 5000.

05

Ignition SCADA versus Wonderware (AVEVA)

Licence model, real cost bands, switching reality and the AU support landscape.

06

Dairy plant MES and batch traceability

Silo to pallet, FSANZ 3.2.2A allergen declaration, and the recall simulation most plants skip.

07

Food manufacturing OEE and SCADA

The 85 per cent benchmark, the multiplication trap, and an OEE figure the GM actually trusts.

08

ISA-88 batch control for food manufacturers

Recipe, unit procedure, operation, phase — in plain English, and when ISA-88 is overkill.

09

SIL determination in Australia (IEC 61511)

IEC 61508 versus 61511, HAZOP and LOPA in plain English, and what most AU studies conclude.

10

Machine safety: AS 4024 and ISO 13849

AS/NZS 4024:2019, performance levels and categories, and what triggers a re-assessment.

11

Cognex versus Keyence industrial vision

Software, deep learning, AU support, integrated lighting, and a decision rule that works.

12

OCR and barcode verification on the line

ISO 15416 and 15415 grades, GS1 retailer requirements, and the WMS handshake that fails quietly.

13

PLC code standards and PackML

The 17-state PackML model, operating modes, PackTags, and code that survives the next engineer.

14

Automation feasibility study: what to expect

What the deliverable contains, what it costs, and where FEED begins.

15

Automation vendor selection in Australia

Integrator versus OEM-direct, writing a fair RFP, and reference checks that actually matter.

16

Automation ROI calculator for manufacturers

The framework plus an embedded calculator. Indicative simple payback in months, for early triage.

Got a project these
articles touch on?

Tell us the process and the constraint. We come back with an approach, not a brochure.

Start a conversation